Penna Electricity Ltd. (Now M/S Pioneer Power Ltd. ) vs. Tamilnadu Electricity Board

Court:Supreme Court of India
Judges:Hon'ble Ajay Rastogi, Hon'ble Bela M. Trivedi
Case Type:Civil Appeal
Reg no:706/2014
Filing no:35834/2013
CNR:SCIN010358342013

Parties & Advocates

Petitioner

1
Penna Electricity Ltd. (now M/s Pioneer Power Ltd. )

Petitioner Advocate

1
A. V. Rangam

Respondents

1
Tamilnadu Electricity Board
2
The Member(generation), The Tamil Nadu Electricity Board
3
The Chief Engineer ( Independent Power Project), The Tamil Nadu Electricity Board
4
The Tamil Nadu Electricity Regulatory Commission

Respondent Advocate

1
Vinodh Kanna B.

Case History with Orders

15 Mar 2023

Disposed - 15 Mar 2023

Final Status

15 Mar 2023

For Judgement

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble Bela M. Trivedi
List In:Judge

Dismissed

27 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble C.T. Ravikumar
List In:Judge

Heard & Reserved

22 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble B.V. Nagarathna
List In:Judge

Not taken up/ Not Today

21 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble B.V. Nagarathna
List In:Judge

Not taken up/ Not Today

14 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble B.V. Nagarathna
List In:Judge

Not taken up/ Not Today

13 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble B.V. Nagarathna
List In:Judge

Not taken up/ Not Today

8 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble B.V. Nagarathna
List In:Judge

Not taken up/ Not Today

1 Sept 2022

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Ajay Rastogi, Hon'ble B.V. Nagarathna
List In:Judge

List On (Date) [08-09-2022]

29 Jul 2020

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Arun Mishra, Hon'ble Vineet Saran, Hon'ble M.R. Shah
List In:Judge

Not taken up/ Not Today

23 Jul 2020

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Arun Mishra, Hon'ble Vineet Saran, Hon'ble M.R. Shah
List In:Judge

21 Jul 2020

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Fixed Date By Court
Category:Unknown
Before:Hon'ble Arun Mishra, Hon'ble Vineet Saran, Hon'ble M.R. Shah
List In:Judge

List On (Date) [23-07-2020]

16 Jul 2020

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Arun Mishra, Hon'ble Vineet Saran, Hon'ble M.R. Shah
List In:Judge

List On (Date) [21-07-2020]

15 Jul 2020

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Arun Mishra, Hon'ble Vineet Saran, Hon'ble M.R. Shah
List In:Judge

14 Jul 2020

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Arun Mishra, Hon'ble Vineet Saran, Hon'ble M.R. Shah
List In:Judge

16 Oct 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

15 Oct 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

3 Oct 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

1 Oct 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

26 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

25 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

24 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

19 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

18 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

17 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

12 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

5 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

4 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

3 Sept 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

29 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

28 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

27 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

22 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

21 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

20 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

14 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

8 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

7 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

6 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Ashok Bhushan, Hon'ble S. Abdul Nazeer
List In:Judge

1 Aug 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

31 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

30 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

25 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

24 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

23 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

18 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

17 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

16 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

11 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

10 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

9 Jul 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Hon'Ble The Chief Justice Ranjan Gogoi, Hon'ble Deepak Gupta, Hon'ble Aniruddha Bose
List In:Judge

Not taken up/ Not Today

2 May 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

1 May 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

30 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

25 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

24 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

23 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

11 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

10 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

9 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

4 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

3 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

2 Apr 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

28 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

27 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

26 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

14 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

13 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

12 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

7 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

6 Mar 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

28 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

27 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Sanjay Kishan Kaul
List In:Judge

Not taken up/ Not Today

26 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

20 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

19 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

14 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

13 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

12 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Vineet Saran
List In:Judge

Not taken up/ Not Today

6 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Sanjay Kishan Kaul
List In:Judge

5 Feb 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

31 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

30 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

29 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

24 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

23 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

22 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

17 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

16 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

9 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

8 Jan 2019

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Rohinton Fali Nariman, Hon'ble Navin Sinha
List In:Judge

Not taken up/ Not Today

9 May 2018

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Adarsh Kumar Goel, Hon'ble Indu Malhotra
List In:Judge

List After Summer Vacation/Dussehra/Diwali/Holi/Winter Vacation

3 May 2018

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Adarsh Kumar Goel, Hon'ble Indu Malhotra
List In:Judge

Not taken up/ Not Today

2 May 2018

First Hearing

Initial hearing scheduled

Company Law, Mrtp, Trai, Sebi, Idrai &Amp; Rbi : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act, Indian Electricity Act, 1910 And 2003, Electricity Supply Act, 1948 And Electricity Reforms Commission Act, 1998 : Matters Pertaining To Trai / Sebi / Idrai And Rbi Including Appeals U/s 18 Of Trai Act

Purpose:Next Week / Week Commencing / C.o.week
Category:Unknown
Before:Hon'ble Adarsh Kumar Goel, Hon'ble Indu Malhotra
List In:Judge

Not taken up/ Not Today

13 Jan 2014

Case Registered

Registration No: 706/2014

11 Nov 2013

Case Filed

11 Nov 2013 Filing No: 35834/2013

Interlocutory Applications (IA) (1)

98125/2022
Particular: EARLY HEARING APPLICATION
Filed by: A. V. RANGAM
Filing Date: 2022-07-19

Tagged Matters (1)

35834/2013(13-01-2014 12:00 AM)C.A. No. 000706 / 2014 Registered on 13-01-2014D No. 035834 / 2013 Registered on 13-01-2014 - CA

Petitioner: M/S PENNA ELECTRICITY LTD.(NOW M/S PIONEER POWER LTD.)
Respondent: TAMILNADU ELECTRICITY BOARD
Type: MStatus: PEntry: 23-09-2015

Earlier Court Details (2)

Court:
High Court
State:
DELHI
Case No:
AN-148-2012
Order Date:
2013-07-10
Judgment Challenged:
Yes
Judgment Type:
Final
Court:
High Court
State:
DELHI
Case No:
AN-112-2012
Order Date:
2013-07-10
Judgment Challenged:
No
Judgment Type:
-

Notices (1)

S.No. 1
55799/2023-03-16
Notice Type: Dismissal Letter with CC
Name:The Registrar
Location:DELHI, NEW DELHI, Station: New Delhi
Issue Date:16 Mar 2023
Return Date:N/A
Dispatch Date:22 Mar 2023
Case Content Last Updated22 Aug 2025, 1:12 pm IST